|
Issue |
Title |
|
Vol 6, No 2 (2016) |
Finite Element Modelling of Rollcrete Concrete Pavement |
Abstract
|
Prashant P. Nagrale, P. G. Gaikawad, Pranav Kulkarni |
|
Vol 6, No 3 (2016) |
Flood Resistant Houses |
Abstract
|
Subhan Ahmad, Mohammad Kamil Khan, Mohd. Saqib |
|
Vol 7, No 1 (2017) |
Forecasting of Factors Affecting Thermiston Work Productivity Estimation by Using Artificial Neural Network |
Abstract
|
Sawsan R. Mohamed |
|
Vol 7, No 1 (2017) |
GFRC Beam Thickness Analysis Using FEM |
Abstract
|
Pratap Dhakad, Rakesh Patel |
|
Vol 5, No 3 (2015) |
Green Concepts in Industrial Buildings - Its Economic Implications and Potential Applications |
Abstract
|
Prakash Rao, Vinoth Vincent, Pavan B |
|
Vol 5, No 3 (2015) |
Identifying Factors Leading to Cost Overrun in Construction Projects in Jordan |
Abstract
|
Ghanim A. Bekr |
|
Vol 6, No 1 (2016) |
Identifying Risk Consequences Affecting Berth Construction Projects |
Abstract
|
B. Sunantha, B. V. Mudgal |
|
Vol 5, No 3 (2015) |
Improving the Forecasting Accuracy of a Project Status Using the Inputs of Earned Value Management – A Review Article |
Abstract
|
B Prakash Rao, Sudhanva N |
|
Vol 2, No 3 (2012) |
Influence of Mineral Admixture on Compressive Strength of Concrete |
Abstract
|
K.S. Radhika, K. Baskar |
|
Vol 3, No 3 (2013) |
Influence of Recycled Coarse Aggregate on Properties of Concrete |
Abstract
|
O. J. Ameh, U. E. Edike |
|
Vol 6, No 1 (2016) |
Key Performance Indicators for Personnel Performance Appraisal System in Construction Industry |
Abstract
|
Chaithra N. Kowshik, Gangadhar Mahesh |
|
Vol 5, No 3 (2015) |
Liquidated Damages: The Perception of the Construction Industry |
Abstract
|
Smitha Yadav, Chennakesavula Sreenadh, Krishna Sai, Reshma Ghouse |
|
Vol 5, No 3 (2015) |
Low Cost Concrete Block: A Sustainable Solution to Construction Industry |
Abstract
|
Vaishali Sahu, Prachi Sohoni |
|
Vol 6, No 2 (2016) |
Maintenance Management in Iraqi Government Buildings |
Abstract
|
Sawsan Rasheed Mohamed |
|
Vol 6, No 2 (2016) |
Management of the Quality of Performance for Construction Projects Using of ISO 9001-2008 as Criteria |
Abstract
|
Entisar K. Rasheed |
|
Vol 6, No 1 (2016) |
Managerial Strategy for Controlling Hazards in Building Construction Projects |
Abstract
|
Shrivastava M, Vigneshkumar C., Uma Maheswari J. |
|
Vol 4, No 3 (2014) |
Method of Analysis for Chloride Distribution in Concrete from Torrent Data |
Abstract
|
Md. Shafiqul Islam, Toshiharu Kishi |
|
Vol 4, No 1 (2014) |
Methodology to Evaluate Technology in the Housing Market |
Abstract
|
Smitha Yadav, Abhinav Sharma |
|
Vol 6, No 2 (2016) |
Monitoring and Forecasting in Construction Projects Using Time Buffer |
Abstract
|
Vishnu S. Pillai, C. Rajasekaran, P. K. Vatsa |
|
Vol 7, No 2 (2017) |
Optimum location of shear wall with plan Irregularity of Multistoried structure for Wind Analysis Using E-Tab |
Abstract
|
Akash S. Waghmode, Dr. A. P. Wadekar, D. N. Kakade |
|
Vol 6, No 2 (2016) |
Participatory Risk Management Model for Construction Projects Using Expert Systems |
Abstract
|
Priyadarshini Das, Gangadhar Mahesh, R. Ranjith Kumar |
|
Vol 1, No 1 (2011) |
Planning for Optimum Maintenance Cost in Water Treatment Plants in Baghdad |
Abstract
|
Mohammed A. Chasib Al Mohsin, Tareq A. Khaleel |
|
Vol 5, No 3 (2015) |
Prediction of Compressive Strength of Concrete Using Machine Learning Techniques |
Abstract
|
Bhagyashri Sawant, A.R. Kambekar |
|
Vol 4, No 1 (2014) |
Prefabrication Methodology for Building Construction |
Abstract
|
Aditya Pande, S. M. Vitankar, Shyam Prajapati |
|
Vol 6, No 1 (2016) |
Preparing a Blueprint for Modification and Development of the Reality of the Construction Contracts in Iraq |
Abstract
|
Entisar K. Rasheed |
|
51 - 75 of 115 Items |
<< < 1 2 3 4 5 > >> |