Open Access Open Access  Restricted Access Subscription or Fee Access

A Study on Time Optimization of Recoat Calender in Tyre Manufacturing Process

J Ramdas

Abstract


Seven components are produced by the recoat calender in this plant. The machine cannot satisfy the current requirements of the company. Utilization planning of the 36 inch recoat calender. Optimize the production time and introduce a compound slitter.

Keywords: Recoat calendar, compound slitter, bead apex

Cite this Article

Ramdas J, A Study on Time Optimization of Recoat Calender in Tyre Manufacturing Process. Journal of Automobile Engineering and Application. 2015; 2(2): 1–4p.



Full Text: PDF

Refbacks

  • There are currently no refbacks.