Analysis of Cost and Schedule Performance of Residential Building Projects by EVM Technique
Abstract
Earned value management (EVM) is a project control technique which provides a quantitative measure of work performance by cost and schedule monitoring. It involves a crediting (earning) of budget as scheduled work is performed. The EVM technique is a proven method to evaluate work progress in order to identify schedule slippage and areas of budget overruns. Value earned for a given task is computed as budgeted cost of work performed and is a function of time, work completed, and budget. In this study, budgeted cost of work performed is compared against actual cost of work performed and budgeted cost of work scheduled to assess cost and schedule variances, respectively. Keywords: Project performance evaluation, cost variance, schedule variance, cost performance index, schedule performance indexVeröffentlicht
Ausgabe
Rubrik
Lizenz
Declaration and Copyright Transfer Form
(to be completed by authors)
I/ We, the undersigned author(s) of the manuscript entitled ‘______________’, hereby declare, that the above manuscript which is submitted for publication in the Journal, is not published already in part or whole (except in the form of abstract) in any journal or magazine for private or public circulation, and, is not under consideration of publication elsewhere.
I/ We have read the final version of the manuscript and am/ are responsible for the thought contents embodied in it. The work dealt in the manuscript is my/ our own, and my/ our individual contribution to this work is significant enough to qualify for authorship. We also agree to the authorship of the article in the following order:
Author’s name Signature (s)
1. ________________
2. ________________
3. ________________
4. ________________