A Step by Step Method for Carrying Out Earned Value Analysis: Case Study of a Road Project
Abstract
A framework of Earned Value Management (EVM) is proposed with the help of case study of a road project completed by Al Tamak, Abu Dhabi (UAE). The framework gives emphasis on the process part (i.e. before the actual start of project monitoring) of Earned Value Management through MS-Project. This framework will help in measuring and managing the variances in schedule and cost of the project in terms of money. The basic framework and calculations of EV structure were designed and a detailed explanation of its successful implementation is presented in this paper. Also this paper encourages contractors and other process owners to use effective internal technical, cost and schedule management control systems. Keywords: Earned Value Management, Project MonitoringCite this ArticleShrivas Abhishek, Das B.B, Batra Sachin, A Step by Step Method for Carrying Out Earned Value Analysis-Case Study of a Road Project, Journal of Construction Engineering, Technology and Management. 2015; 5(3): 18–24p.Veröffentlicht
Ausgabe
Rubrik
Lizenz
Declaration and Copyright Transfer Form
(to be completed by authors)
I/ We, the undersigned author(s) of the manuscript entitled ‘______________’, hereby declare, that the above manuscript which is submitted for publication in the Journal, is not published already in part or whole (except in the form of abstract) in any journal or magazine for private or public circulation, and, is not under consideration of publication elsewhere.
I/ We have read the final version of the manuscript and am/ are responsible for the thought contents embodied in it. The work dealt in the manuscript is my/ our own, and my/ our individual contribution to this work is significant enough to qualify for authorship. We also agree to the authorship of the article in the following order:
Author’s name Signature (s)
1. ________________
2. ________________
3. ________________
4. ________________