Aller directement au contenu principal
Aller directement au menu principal
Aller au pied de page
Open Menu
Journal of Construction Engineering, Technology & Management
Current
Archives
Announcements
About
About the Journal
Submissions
Editorial Masthead
Privacy Statement
Contact
Rechercher
Register
Login
Accueil
/
Archives
/
Vol. 3 No. 1 (2013)
Vol. 3 No. 1 (2013)
Publié:
2013-05-24
Research Articles
A Comparative Study on Causes of Delay Incompletion of Construction Projects in Oman
Mohammed A. Chasib Al Mohsin, Ali Alnuaimi
1-6
Accès restreint aux abonnés-es
PDF (anglais)
(USD 20)
Empirical Evaluation of Performance of Construction Management at-Risk (CM at-Risk) Project Delivery System With and Without Agency-CM
Abdul Khader Jeelani Shaik, Dr. Adel S. Al-Dosary, Dr. J. Karthikeyan
13-25
Accès restreint aux abonnés-es
PDF (anglais)
(USD 20)
Review Articles
Diagnosis and Repair of Deteriorated Concrete Structures
Sanjay Gupta
7-12
Accès restreint aux abonnés-es
PDF (anglais)
(USD 20)
Experimental Study on Fibre Reinforced High Performance Concrete with Silica Fume
Durai S, Boobalan S C, P. Muthupriya, R. Venkatasubramani
26-30
Accès restreint aux abonnés-es
PDF (anglais)
(USD 20)
Développé par
Open Journal Systems
Abonnement
Ouvrir une session pour vérifier l'abonnement.
Langue
čeština
dansk
Deutsch
English
español
français
italiano
日本語
português
русский
中文
Renseignements
Pour les lecteurs-trices
Pour les auteurs-es
Pour les bibliothécaires