A Comparative Study on Causes of Delay Incompletion of Construction Projects in Oman
要旨
The aim of this paper was to identify the problems resulting from the delays in completion of construction projects in Oman. A field study was conducted on a number of construction projects in Muscat area to collect data required for analysis. Two groups of projects were studied, the first group included projects constructed during the period 2007–2008 and the second group studied comprised projects constructed during the period 2009–2010. It was found that 40 per cent of the projects constructed during the periods of both groups have experienced delays in completion with slight differences in the length of delay between the two groups. Another finding was that the causes of delay are changing with the time in a pattern depending on different variables. Owner related causes were found to be the dominant reason for delay and contrarily the first to seek solutions. Keywords: delay, construction projects, Oman, contracts発行日
巻号
セクション
ライセンス
Declaration and Copyright Transfer Form
(to be completed by authors)
I/ We, the undersigned author(s) of the manuscript entitled ‘______________’, hereby declare, that the above manuscript which is submitted for publication in the Journal, is not published already in part or whole (except in the form of abstract) in any journal or magazine for private or public circulation, and, is not under consideration of publication elsewhere.
I/ We have read the final version of the manuscript and am/ are responsible for the thought contents embodied in it. The work dealt in the manuscript is my/ our own, and my/ our individual contribution to this work is significant enough to qualify for authorship. We also agree to the authorship of the article in the following order:
Author’s name Signature (s)
1. ________________
2. ________________
3. ________________
4. ________________