Saltar para conteúdo principal Saltar para menu de navegação principal Saltar para rodapé do site
Journal of Construction Engineering, Technology & Management
  • Current
  • Archives
  • Announcements
  • About
    • About the Journal
    • Submissions
    • Editorial Masthead
    • Privacy Statement
    • Contact
Pesquisar
  • Register
  • Login
  1. Página de Início /
  2. Arquivos /
  3. Vol. 3 N.º 1 (2013)

Vol. 3 N.º 1 (2013)

					Ver Vol. 3 N.º 1 (2013)
Publicado: 2013-05-24

Research Articles

  • A Comparative Study on Causes of Delay Incompletion of Construction Projects in Oman

    Mohammed A. Chasib Al Mohsin, Ali Alnuaimi
    1-6
    • Acesso Restrito PDF (inglês) (USD 20)
  • Empirical Evaluation of Performance of Construction Management at-Risk (CM at-Risk) Project Delivery System With and Without Agency-CM

    Abdul Khader Jeelani Shaik, Dr. Adel S. Al-Dosary, Dr. J. Karthikeyan
    13-25
    • Acesso Restrito PDF (inglês) (USD 20)

Review Articles

  • Diagnosis and Repair of Deteriorated Concrete Structures

    Sanjay Gupta
    7-12
    • Acesso Restrito PDF (inglês) (USD 20)
  • Experimental Study on Fibre Reinforced High Performance Concrete with Silica Fume

    Durai S, Boobalan S C, P. Muthupriya, R. Venkatasubramani
    26-30
    • Acesso Restrito PDF (inglês) (USD 20)

Desenvolvido por

Open Journal Systems

Subscrição

Aceda ao sistema para visualizar recursos disponíveis apenas a subscritores.

Idioma

  • čeština
  • dansk
  • Deutsch
  • English
  • español
  • français
  • italiano
  • 日本語
  • português
  • русский
  • 中文

Informações

  • Para Leitores
  • Para Autores
  • Para Bibliotecários
Mais informação sobre o sistema de publicação, Plataforma e Fluxo de Trabalho do OJS/PKP.