Saltar para conteúdo principal
Saltar para menu de navegação principal
Saltar para rodapé do site
Open Menu
Journal of Construction Engineering, Technology & Management
Current
Archives
Announcements
About
About the Journal
Submissions
Editorial Masthead
Privacy Statement
Contact
Pesquisar
Register
Login
Página de Início
/
Arquivos
/
Vol. 4 N.º 2 (2014)
Vol. 4 N.º 2 (2014)
Publicado:
2014-07-03
Research Articles
Cost Objective Model for Construction Equipment Replacement Policies
Raji Al-Ani, Annas Al-Saadie
1-13
Acesso Restrito
PDF (inglês)
(USD 20)
Safety Issues with Tower Crane and Remedial Measures
P. S. Gandhak, Rahul Wankhade
14-21
Acesso Restrito
PDF (inglês)
(USD 20)
Water Permeability of Hybrid Steel Fiber Reinforced Concrete
M P Singh, S P Singh, A P Singh
30-37
Acesso Restrito
PDF (inglês)
(USD 20)
Review Articles
Stakeholder’s Perception of the Causes and Effects of Construction Delays on Project Delivery: A Review
P. S. Gandhak, Syed. Sabihuddin
22-29
Acesso Restrito
PDF (inglês)
(USD 20)
Short Articles
The Role of Cost Estimation/Tendering in Engineering Projects in Nigeria
George N. Osaghae
38-42
Acesso Restrito
PDF (inglês)
(USD 20)
Desenvolvido por
Open Journal Systems
Subscrição
Aceda ao sistema para visualizar recursos disponíveis apenas a subscritores.
Idioma
čeština
dansk
Deutsch
English
español
français
italiano
日本語
português
русский
中文
Informações
Para Leitores
Para Autores
Para Bibliotecários