Saltar para conteúdo principal
Saltar para menu de navegação principal
Saltar para rodapé do site
Open Menu
Journal of Construction Engineering, Technology & Management
Current
Archives
Announcements
About
About the Journal
Submissions
Editorial Masthead
Privacy Statement
Contact
Pesquisar
Register
Login
Página de Início
/
Arquivos
/
Vol. 5 N.º 3 (2015)
Vol. 5 N.º 3 (2015)
Publicado:
2015-07-14
Research Articles
Comparative Study of Schedule Analysis Using Earned Value and Earned Schedule Methods on Two Distinct Construction Projects
B. Prakash Rao, Jacob Cherian, Leon Jeremiah
1-5
Acesso Restrito
PDF (inglês)
(USD 20)
Green Concepts in Industrial Buildings - Its Economic Implications and Potential Applications
Prakash Rao, Vinoth Vincent, Pavan B
6-12
Acesso Restrito
PDF (inglês)
(USD 20)
Identifying Factors Leading to Cost Overrun in Construction Projects in Jordan
Ghanim A. Bekr
25-33
Acesso Restrito
PDF (inglês)
(USD 20)
Prediction of Compressive Strength of Concrete Using Machine Learning Techniques
Bhagyashri Sawant, A.R. Kambekar
34-41
Acesso Restrito
PDF (inglês)
(USD 20)
Controlling Construction Problems through Creativity and Innovation: A Preliminary Theoretical Perspective
Wilson Udo Udofia
42-51
Acesso Restrito
PDF (inglês)
(USD 20)
Liquidated Damages: The Perception of the Construction Industry
Smitha Yadav, Chennakesavula Sreenadh, Krishna Sai, Reshma Ghouse
59-67
Acesso Restrito
PDF (inglês)
(USD 20)
Low Cost Concrete Block: A Sustainable Solution to Construction Industry
Vaishali Sahu, Prachi Sohoni
68-74
Acesso Restrito
PDF (inglês)
(USD 20)
Durability Design of Reinforced Concrete Beams Using Cost Minimization by Excel Solver
Md. Shafiqul Islam
75-81
Acesso Restrito
PDF (inglês)
(USD 20)
Case Study
A Step by Step Method for Carrying Out Earned Value Analysis: Case Study of a Road Project
Abhishek Shrivas, B. B. Das, Sachin Batra
18-24
Acesso Restrito
PDF (inglês)
(USD 20)
Assessment of Impact of Rise in Price of Building Materials on Real Estate Development: A Case Study of Lagos State, Nigeria
Adeyemo Oludotun Abayomi, Aruleba Olalekan Bamidele
52-58
Acesso Restrito
PDF (inglês)
(USD 20)
Review Articles
Improving the Forecasting Accuracy of a Project Status Using the Inputs of Earned Value Management – A Review Article
B Prakash Rao, Sudhanva N
13-17
Acesso Restrito
PDF (inglês)
(USD 20)
Desenvolvido por
Open Journal Systems
Subscrição
Aceda ao sistema para visualizar recursos disponíveis apenas a subscritores.
Idioma
čeština
dansk
Deutsch
English
español
français
italiano
日本語
português
русский
中文
Informações
Para Leitores
Para Autores
Para Bibliotecários