Improving the Forecasting Accuracy of a Project Status Using the Inputs of Earned Value Management – A Review Article

Autori

  • B Prakash Rao
  • Sudhanva N

Parole chiave:

EVM, Forecasting accuracy, Deterministic approach

Abstract

The earned value method (EVM) is recognized as a viable method for evaluating and forecasting project cost performance. Its application to schedule performance forecasting has been limited due to poor accuracy. The index based EVM forecasting methods are deterministic approaches having large forecasting errors in the initial stages of a project. Hence this paper gives a brief overview of the advanced accurate approaches like Kalman filter, growth model and linear modelling which can be used to obtain accurate cost and schedule estimates and it also provides future scope in the area of project forecasting for future research.  Keywords: EVM, Forecasting accuracy, Deterministic approachCite this Article Prakash Rao B, Sudhanva N, Improving the Forecasting Accuracy of a Project Status Using the Inputs of Earned Value Management – A Review Article, Journal of Construction Engineering, Technology and Management. 2015; 5(3): 13–17p.

Biografia autore

  • B Prakash Rao
    II Sem M.tech, Construction Engineering and Management, Manipal Institute of Technology, Manipal

Pubblicato

2015-07-14

Fascicolo

Sezione

Review Articles