Salta al contenuto principale
Salta al menu principale di navigazione
Salta al piè di pagina del sito
Open Menu
Journal of Construction Engineering, Technology & Management
Current
Archives
Announcements
About
About the Journal
Submissions
Editorial Masthead
Privacy Statement
Contact
Cerca
Register
Login
Home
/
Archivi
/
V. 5 N. 3 (2015)
V. 5 N. 3 (2015)
Pubblicato:
2015-07-14
Research Articles
Comparative Study of Schedule Analysis Using Earned Value and Earned Schedule Methods on Two Distinct Construction Projects
B. Prakash Rao, Jacob Cherian, Leon Jeremiah
1-5
Accesso riservato
PDF (inglese)
(USD 20)
Green Concepts in Industrial Buildings - Its Economic Implications and Potential Applications
Prakash Rao, Vinoth Vincent, Pavan B
6-12
Accesso riservato
PDF (inglese)
(USD 20)
Identifying Factors Leading to Cost Overrun in Construction Projects in Jordan
Ghanim A. Bekr
25-33
Accesso riservato
PDF (inglese)
(USD 20)
Prediction of Compressive Strength of Concrete Using Machine Learning Techniques
Bhagyashri Sawant, A.R. Kambekar
34-41
Accesso riservato
PDF (inglese)
(USD 20)
Controlling Construction Problems through Creativity and Innovation: A Preliminary Theoretical Perspective
Wilson Udo Udofia
42-51
Accesso riservato
PDF (inglese)
(USD 20)
Liquidated Damages: The Perception of the Construction Industry
Smitha Yadav, Chennakesavula Sreenadh, Krishna Sai, Reshma Ghouse
59-67
Accesso riservato
PDF (inglese)
(USD 20)
Low Cost Concrete Block: A Sustainable Solution to Construction Industry
Vaishali Sahu, Prachi Sohoni
68-74
Accesso riservato
PDF (inglese)
(USD 20)
Durability Design of Reinforced Concrete Beams Using Cost Minimization by Excel Solver
Md. Shafiqul Islam
75-81
Accesso riservato
PDF (inglese)
(USD 20)
Case Study
A Step by Step Method for Carrying Out Earned Value Analysis: Case Study of a Road Project
Abhishek Shrivas, B. B. Das, Sachin Batra
18-24
Accesso riservato
PDF (inglese)
(USD 20)
Assessment of Impact of Rise in Price of Building Materials on Real Estate Development: A Case Study of Lagos State, Nigeria
Adeyemo Oludotun Abayomi, Aruleba Olalekan Bamidele
52-58
Accesso riservato
PDF (inglese)
(USD 20)
Review Articles
Improving the Forecasting Accuracy of a Project Status Using the Inputs of Earned Value Management – A Review Article
B Prakash Rao, Sudhanva N
13-17
Accesso riservato
PDF (inglese)
(USD 20)
Sviluppato a cura di
Open Journal Systems
Abbonamento
Entra per accedere a risorse riservati agli abbonati.
Lingua
čeština
dansk
Deutsch
English
español
français
italiano
日本語
português
русский
中文
Informazioni
Per i lettori
Per gli/le autori/rici
Per i sistemi bibliotecari