Comparative Study of Schedule Analysis Using Earned Value and Earned Schedule Methods on Two Distinct Construction Projects

Autori

  • B. Prakash Rao Manipal University,Manipal
  • Jacob Cherian
  • Leon Jeremiah

Parole chiave:

Earned value, Earned Schedule, Schedule analysis, reliability, correlation

Abstract

This paper focuses on how Earned Value (EV) and Earned Schedule (ES) is used for schedule analysis to monitor the progress and forecast important information in schedule; well before it is too late to make any corrective changes. Two case studies are adopted here. Using Earned Value, its monthly performance is computed along with project completion date is forecasted. The reliability of the two methods is compared using correlation analysis between the two case studies and it is seen that the dependency between the earned schedule variables between the two case studies are higher than that of the earned value ones. Keywords: Earned value, Earned Schedule, Schedule analysis, reliability, correlation   Cite this Article Prakash Rao B, Jacob Cherian, Leon Jeremiah, Comparative Study of Schedule Analysis Using Earned Value and Earned Schedule Methods on Two Distinct Construction Projects, Journal of Construction Engineering, Technology and Management. 2015; 5(3): 1–5p.

Biografia autore

  • B. Prakash Rao, Manipal University,Manipal
    Associate Professor(Senior Scale),Dept. of Civil Engineering

Pubblicato

2015-07-14

Fascicolo

Sezione

Research Articles